Gas Turbine Installation

Gas turbine installation by Coretech Energy. Precision commissioning, alignment & testing for power plants. OEM-certified teams, fast-track options available.

Gas Turbine Installation

Turnkey Gas Turbine Installation Solutions

Coretech Energy delivers end-to-end gas turbine installation for power generation and mechanical drive applications. Our OEM-certified teams combine rigorous protocols with advanced technologies for optimal performance from first fire.


Comprehensive Installation Services

✔ Pre-Installation Engineering


Foundation FEA analysis & dynamic modeling


Air intake/exhaust system CFD optimization


Fuel skid integration planning


✔ Precision Installation


GTG train alignment (<0.025mm TIR)


Combustion canister concentricity checks


Auxiliary system piping (ASME B31.3)


✔ Commissioning & Performance Testing


Dry cranking & lubrication system flush


Flame detection calibration


Emissions compliance testing (NOx/CO)


Load rejection tests


Coretech Installation Advantages

→ Laser shaft alignment (to 0.001")

→ Acoustic emission monitoring during first fire

→ 72-hour reliability run before handover

→ OEM-validated startup curves


"Coretech commissioned our 200MW GT in 22 days - beating the schedule by 14%." - EPC Project Director


[Request Installation Plan] or [Download GT Checklist] (CTA buttons)


Installation Specifications


Parameter Heavy-Duty GT Aeroderivative GT

Alignment Tolerance 0.05mm 0.03mm

Commissioning Time 4-6 weeks 2-3 weeks

Exhaust Temp Variance ±5°C ±3°C