Generator assembly & testing by Coretech Energy. Precision winding, rotor balancing, and OEM-compliant commissioning for optimal performance.

Generator Installation

Precision Generator Assembly Solutions

Coretech Energy delivers turnkey generator assembly services for power plants and industrial facilities. Our IEC 60034-certified technicians combine OEM specifications with advanced quality controls to ensure reliable operation from first synchronization.


Comprehensive Assembly Process

✔ Core Component Integration


Stator winding (form-wound coils)


Rotor insertion (±0.1mm clearance)


Hydrogen cooler installation


✔ Precision Alignment


Air gap verification (laser measurement)


Bearing pedestal leveling (<0.02mm/m)


Coupling face runout checks


✔ Performance Validation


Megger testing (5kV minimum)


Surge comparison testing


Hydrogen leakage rate verification


Coretech Assembly Standards

→ Rotor dynamic balance (ISO 1940 G1.0)

→ Partial discharge <10pC at 1.5Un

→ Vibration levels <1.8mm/s (ISO 10816)

→ 72-hour loaded test run


"Coretech's assembly reduced our generator commissioning time by 40% while meeting all OEM tolerances." - Plant Engineering Manager


[Request Assembly Quote] or [Download Technical Specs] (CTA buttons)


Assembly Specifications Table


Parameter Air-Cooled Hydrogen-Cooled

Winding Resistance Tolerance ±1% ±0.5%

Rated Voltage Test 2Un + 1kV 2.5Un + 2.5kV

Assembly Lead Time 3-5 weeks 6-8 weeks