Generator Installation
Generator assembly & testing by Coretech Energy. Precision winding, rotor balancing, and OEM-compliant commissioning for optimal performance.

Precision Generator Assembly Solutions
Coretech Energy delivers turnkey generator assembly services for power plants and industrial facilities. Our IEC 60034-certified technicians combine OEM specifications with advanced quality controls to ensure reliable operation from first synchronization.
Comprehensive Assembly Process
✔ Core Component Integration
Stator winding (form-wound coils)
Rotor insertion (±0.1mm clearance)
Hydrogen cooler installation
✔ Precision Alignment
Air gap verification (laser measurement)
Bearing pedestal leveling (<0.02mm/m)
Coupling face runout checks
✔ Performance Validation
Megger testing (5kV minimum)
Surge comparison testing
Hydrogen leakage rate verification
Coretech Assembly Standards
→ Rotor dynamic balance (ISO 1940 G1.0)
→ Partial discharge <10pC at 1.5Un
→ Vibration levels <1.8mm/s (ISO 10816)
→ 72-hour loaded test run
"Coretech's assembly reduced our generator commissioning time by 40% while meeting all OEM tolerances." - Plant Engineering Manager
[Request Assembly Quote] or [Download Technical Specs] (CTA buttons)
Assembly Specifications Table
Parameter Air-Cooled Hydrogen-Cooled
Winding Resistance Tolerance ±1% ±0.5%
Rated Voltage Test 2Un + 1kV 2.5Un + 2.5kV
Assembly Lead Time 3-5 weeks 6-8 weeks