Steam Turbine Installation

Turnkey steam turbine installation by Coretech Energy. Precision commissioning, alignment & testing for power plants and industrial facilities. ASME compliant.

Steam Turbine Installation

End-to-End Steam Turbine Installation Solutions

Coretech Energy delivers OEM-approved installation services for steam turbines up to 500MW, ensuring seamless integration with your power generation systems. Our ASME PCC-1 certified teams combine rigorous protocols with advanced metrology for flawless startups.


Comprehensive Installation Scope

✔ Pre-Installation Preparation


Foundation analysis & grouting plans


Anchor bolt tension verification


Pipe stress analysis (CAESAR II)


✔ Precision Installation


Rotor lifting & positioning (±0.02mm)


Casing alignment (laser optical systems)


Coupling face parallelism checks


✔ Commissioning & Testing


Barring gear run-in procedures


Overspeed trip verification


Heat rate performance testing


Coretech Installation Standards

→ Turbine-Generator alignment <0.025mm TIR

→ Vibration levels <1.5 mm/s (ISO 10816)

→ Steam blow cleanliness (ASA 3 targets)

→ 72-hour continuous run test


"Coretech achieved first-fire to sync in 11 days - 30% faster than industry average." - IPP Project Manager


[Request Installation Proposal] or [Download Commissioning Checklist] (CTA buttons)


Installation Performance Metrics


Parameter Standard Installation Fast-Track Option

Typical Duration 6-8 weeks 4 weeks (24/7 shifts)

Alignment Tolerance 0.05mm 0.03mm (premium)

Warranty Coverage 12 months 24 months